Cienaga LNG. Colombia.
Development of LNG import - export project at Cienaga. Santa Marta. Colombia. Site selection - assessment for dual import - export options FSRU - FLNG operation. Project currently on first permitting phase (2024). In Co-development with Cienaga Partners team.
Cienaga project
Capture and Industrialization of Associated Gas Petroecuador.
Identification and quantification of investments and expenses of recovery,
processing and monetization of gas vents / flaring in 4 blocks in the north-east
of Ecuador. Manager of the bidding process. Under contract with New Stratus
Energy. June-Dec 2022
Identification and analysis of opportunities to improve logistics for the Malvinas
gas plant (Pluspetrol. Camisea. Peru).
The Malvinas Plant exports up to 1,600 mmscfd of natural gas, of which partial volumes are
destined for domestic consumption, export and re-injection. As a result of these studies PlusPetrol analyzes a set of
initiatives to select and introduce improvements in its logistics (carried under contract with Decisiones Logísticas. Colombia)
Contract 2Q – 4Q. 2022
Maria Conchita gas treatment and compression plant. Guajira. Colombia.
Maria Conchita gas gathering and treatment plant. NG Energy, Guajira, Colombia. Completed first gas from Aruchara well in October 2022. Nexta provided the Front-End Engineering Design gas process, mechanical and electrical engineering with the assistance of AB Proyectos (Colombia). Genius Eng. (Colombia) integrated and added civil and piping engineering. Clients: Genius Eng. / GTX. Owner: NG Energy. Original capacity of 20 mmscfd Contract 1Q - 2Q. 2022.
Constructability study. Subsea pipeline strain and data fiber optics
OCENSA TLU-2 Communication and strain measurement Fiber Optics offshore
and onshore Installation. Coveñas. Colombia.
Study, analysis and diagnosis of construction and installation processes:
Materials & Equipment transport & delivery
Marine MOB & Shop assembly
Marine and onshore Fiber Optics installation
Client: Aviatek- Geomares – Serport - SFI. 1Q-2Q. 2020
Constructability study. Loading buoy and PLEm replacement
OCENSA TLU-2 Pipeline End Manifold (PLEM) and Off-loading buoy replacement. Study, analysis and diagnosis of construction and installation processes: Materials & Equipment transport & delivery Marine MOB & Shop assembly PLEM & Buoy replacement & commissioning. Client: Monobuoy – Cambridge. OCENSA Coveñas. Colombia. 2019.