Quality Assurance

Contact Us for Help

Contact with us through our representative or submit a business inquiry online.

CONTACT US
img
img

Quality assurance in engineering

    Definition of Quality Requirements for Engineering providers
    Engineering PEER Review, What If, HAZOP, QRA
    Engineering Quality Plan Review
    Risk Process Analysis / Process Infrastructure and Well Equipment Hazard Analysis PHA
    Value Improvement Practices VIP
    Process Safety Management PSM (PSM (OSHA 1190.119 15 elements /CCPS 20 elements)
    Quality Assurance, Audit and Risk studies
    Technical inspection services
    Development of engineering concepts, Consulting, Auditing
    Nondestructive testing, NDT, Geotechnical studies
    Mechanical integrity studies: API 579/580
    Training of operations personnel (HSE, Risk analysis)

Quality assurance in equipment and materials

    Verify/approve quality plans delivered by manufacturers, and suppliers of Materials and Equipment
    Verify compliance with procedures, standards, codes, specifications and Inspection & Testing Plan (ITP) delivered by suppliers and manufacturers
    Monitoring of activities, procedures and responsible liable presented by each supplier and/or manufacturer
    Verification of compliance of actions implemented ensuring ITP compliance
    Verification and acceptance of dossiers of materials and equipment
    Verify compliance of audit plans submitted by manufacturers, suppliers of equipment and materials.

Quality assurance in construction


    Review / approval of quality plans and construction Inspection & Testing Plan (ITP)
    Review / approval of certification matrix and pre commissioning plan
    Assessment of contractor quality system performance
    Well drilling (well construction) QA
    Audit and/or verification of closures of NonConformity Reports. Daily and weekly Status management (DWSM)
    Verification and follow up of Closure of A and B Construction pending items. DWSM
    Validation / acceptance of Construction Dossier (CD) submitted by construction contractor
    Follow up of RED LINE drawings and their inclusion in all fabrication and construction phases at CDs Witnessing of Pre-commissioning Site Testing (SAT tests)
    Acceptance of PRE-commissioning AC-1 DOSSIER, submitted by the contractor. DWSM

Quality assurance in Equipment Overhauls (OVH) / Maintenance

    Ensure that the evidence during disassembly complies with diagnostic reports
    Ensure that damaged or affected parts are removed and kept in customer’s custody and are not reused during the OVH
    >Ensure that listings of spare parts content those corresponding to the equipment and are those recommended by the manufacturer for the OVH
    Ensure that assembly is carried out in compliance with the technical specifications of equipment manufacturers
    Ensure that results of measurements (metrology), is correct, performed by calibrated equipment and duly selected for the operation
    Gensets FAT. Verify compliance of the equipment's behavior during the load test with the manufacturer's specification
    Verify that the OVH dossiers comply with the signatures and guidelines established in the procedures by the customer and comply with the guidelines of the manufacturer

img
img


Quality assurance in pre-comissioning

    Verify APC engineering deliverables and master list of documents applicable to the project
      Verify that all systems and subsystems are properly identified, according to codes of business units, general area of the plant, functional area and /or defined process system
        Verify that certificates contain all the necessary information for mechanical completion and are signed by the corresponding bodies.
          Check and track status of pending items, raising alerts according to delays on scheduled closure date
            Verify that AC-1 dossiers comply with all signatures and guidelines established in procedures, ITP, for delivering to commissioning stage


            Quality assurance in comissioning

              Validate the test matrix to be performed, which must be tracked to ensure compliance
              Ensure that all systems or equipment going into service has been tested, has certificates completed and with no pending items type A or more than type B. Raise alerts in case of noncompliance
              Track the type of pending items raised and their respective closure in a timely manner
              Review the progress of HC-01s development and their corresponding content to ensure content and completeness of information for transfer of custody of all subsystems
              Ensure that delivery is made through signing of certificates of acceptance by both parties and that custody units receive proper documentation
            img

            Project Structuring

            Comprehensive knowledge of infrastructure project management, planning, design, construction, economic analysis, regulatory and environmental compliance

            img

            Project Definition

            Extensive experience in elaboration, definition and execution of oil, gas and LNG infrastructure projects

            img

            Project brief estimate

            Development of Class V (visualization) estimates of cost (CAPEX - OPEX), schedule and preliminary management structure and risk assessment

            Frequently Asked questions

            Looking for a quality and affordable Services for your next project?